DeluxHost - Plus Node Maintenance – Maintenance details

Plus Node Maintenance

Completed
Scheduled for April 03, 2025 at 2:20 PM – 3:11 PM

Affects

Performance Node

Under maintenance from 2:20 PM to 3:11 PM

PNODE-01

Under maintenance from 2:20 PM to 3:11 PM

PNODE-02

Under maintenance from 2:20 PM to 3:11 PM

PNODE-03

Under maintenance from 2:20 PM to 3:11 PM

PNODE-04

Under maintenance from 2:20 PM to 3:11 PM

PNODE-05

Under maintenance from 2:20 PM to 3:11 PM

Updates
  • Completed
    April 03, 2025 at 3:11 PM
    Completed
    April 03, 2025 at 3:11 PM
    Maintenance has completed successfully.
  • In progress
    April 03, 2025 at 2:20 PM
    In progress
    April 03, 2025 at 2:20 PM
    Maintenance is now in progress
  • Planned
    April 03, 2025 at 2:20 PM
    Planned
    April 03, 2025 at 2:20 PM

    During this maintenance, we expect a downtime of approximately 5-10 minutes for each node. This operation aims to increase the network capacity of these nodes and improve their scalability for the future. During this period, temporary network disconnections may occur.

    The network capacity upgrade will involve enhancing both the hardware and software infrastructure, allowing the nodes to handle higher data traffic volumes and better adapt to future scalability needs. Therefore, while maintenance is in progress, connections may experience brief interruptions.


    Once the intervention is complete, the network should be able to handle more simultaneous requests and provide higher performance, improving the overall reliability of the system in the long term.