Scheduled for April 03, 2025 at 2:00 PM – 2:40 PM 40 minutes
Planned
April 03, 2025 at 2:00 PMPlanned
April 03, 2025 at 2:00 PMDuring this maintenance, we expect a downtime of approximately 5-10 minutes for each node. This operation aims to increase the network capacity of these nodes and improve their scalability for the future. During this period, temporary network disconnections may occur.
The network capacity upgrade will involve enhancing both the hardware and software infrastructure, allowing the nodes to handle higher data traffic volumes and better adapt to future scalability needs. Therefore, while maintenance is in progress, connections may experience brief interruptions.
Once the intervention is complete, the network should be able to handle more simultaneous requests and provide higher performance, improving the overall reliability of the system in the long term.